• Project ObjectivesFacilitate double decking to Shetland
  • Project ObjectivesEnable retail unloading of low-height ‘ferry’ trailers
  • Project ObjectivesLoad double deck/ standard vehicles to ground in flat-floor yard
  • Project DesignDevelop 6.5-tonne V2G (vehicle-to-ground) loadhouse
  • Project DesignSite survey – with CAD drawings, 3D modelling and Autoturn®
  • Project DesignBespoke dock extension – under low canopy
  • Project FulfilmentLift provides run-through from warehouse to yard
  • Project ResultsInstall completed in 1 day – saving 1 delivery per day
Banner Slider by WOWSlider.com v4.4