• Project ObjectivesImprove DC double deck loading speed & reliability
  • Project ObjectivesEnable direct run-through from warehouse to lower deck
  • Project Design7 x 6.5-tonne double deck lifts installed
  • Project DesignBespoke warehouse tailored to speed up DD loading
  • Project FulfilmentLift designed to accommodate trailer tail lifts
  • Project FulfilmentVehicle turnaround times: as little as 50 minutes
  • “Transdek’s modular pod system was fitted and fully operational within 24-hours, which was crucial at such a busy distribution centre.”