• Project ObjectivesEnable to-ground loading from raised docks at Wednesbury DC
  • Project ObjectivesExpand loading speed & capacity at 10 x bays
  • Project Design10 x 4.5-tonne dock lifts/ 8-rollcage or 4-pallet capacity
  • Project DesignSurface-mounted with lead-on ramps
  • Project Fulfilment3 of 10 units built in kit form due to restricted access
  • Project FulfilmentMarried to internal loading docks
  • “Transdek’s 4.5T model has significantly increased our loading speed. We have been very impressed with Transdek’s flexible approach... it was vital that they could make the integration of the new lifts as seamless as possible.”
Banner Slider by WOWSlider.com v4.4

[ Back to Case Studies ]